City of Toronto Utility Relocation

Client

Carillion Canada

Location

Toronto, Ontario

PROJECT DESCRIPTION

Black & McDonald Limited (B&M) was chosen by the City of Toronto for a construction contract extending the Path system. This extension took place at Front and York Street and required the existing utilities to be relocated to allow construction of the Path.

B&M SCOPE OF WORK

B&M was required to engineer the breakout and removal of Toronto Hydro duct bank and cable chambers. Toronto Hydro duct bank and cable chambers were rebuilt to suit new hydro feeds. The job requirements included breaking out existing duct banks and rebuilding at new elevations, along with relocating fibre into a new conduit. Telecommunication systems that include Bell, Allstream, Telus and Cogeco were in need of relocation. Set up of temporary traffic lights and installation of final traffic lights after completion of tunnel was also required.

BENEFITS TO CLIENT

In addition to successfully completing the scope of work, new Toronto hydro high voltage feeds were installed and terminated by B&M to allow existing Toronto Hydro power to be decommissioned and removed. Cable that was installed was lead cable due to the existing feeds in the city of Toronto.

Get In Touch

Join Our Team

You believe that if something’s worth doing, it’s worth doing right. That solutions should be made to last. That being part of a team means working not just for oneself but for one another. That’s how we operate too.

Join Our Team

Sign Up For Our Newsletter

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.