PROJECT DESCRIPTION
Part of the Darlington cyclical maintenance program includes turbine and generator maintenance and inspections to ensure the integrity of critical plant equipment as well as extend the expected life of the equipment.
Scheduled maintenance on each of the Darlington units’ turbines and generators are completed as part of a rotating unit shutdown in order to abide by station commitments made to the Canadian Nuclear Safety Commission (CNSC) to maintain the station’s operating license.
B&M SCOPE OF WORK
Black & McDonald’s (B&M) scope of work for the turbine outage was the removal, cleaning, and reassembly of major and minor components of the Unit 4 Steam Turbine and Generator. Turbine components included low-pressure turbine Stages 1 and 3, consisting of all major blade carriers and over 800 carrier studs. Generator components included hydrogen seals, diffusers, and generator end doors. Additional components and equipment included were pressure stop valves, motor control valves, steam chests, and six shaft bearings. The scope also included component replacements and repairs for supporting systems such as lube oil, seal oil, stator cooling water, moisture separators and reheaters, and the condenser hot wells.
Additionally, during execution of the maintenance program, B&M owned all confined space monitoring and foreign material exclusion for the project, including during the inspection phase, to maintain both worker safety and the integrity of the critical components.
Get In Touch
Join Our Team
You believe that if something’s worth doing, it’s worth doing right. That solutions should be made to last. That being part of a team means working not just for oneself but for one another. That’s how we operate too.